
BUILDING SERVICES (ARC 2423)
Project 1 - Case Study and Documentation of Building Services Systems
The requirements of the project are as follows:
1. Identify all the required building services components installed in the building
2. Perform a thorough study on all the services systems
i. water supply system
ii. electrical supply system
iii. sewerage, sanitary & drainage system
iv. mechanical transportation system
v. mechanical ventilation and air-conditioning system
vi. fire protection system
3. Obtain estimated dimensions and sizes of the spaces required for all the equipment and plant rooms identified
4. Provide brief explanation on how the building services components function. This explanation shall be in
qualitative form and therefore no calculation is required.
5. Summarize the systems in diagrammatic form.
Click this link below to access report:
http://issuu.com/geshen/docs/b.services_final_report_p1.compress
Project 2 – Application of Building Services
This project is related to the students’ studio design project in semester 2 which relates to a domestic size building (i.e. a retreat house, etc.) Students are expected to demonstrate their understanding of building services by proposing and designing the most appropriate systems for the building which include:
i) electrical supply system (including split unit air-cond)
ii) cold water and hot water supply system
iii) sewerage and sanitary system
iv) drainage system
Therefore students are required to produce appropriate drawings and diagrams which include specifications, symbols, legends, images, texts, etc. to describe the planning and installation of all the building services. Additionally, students may also include specific clauses from the Uniform Building By-Law (UBBL) or other relevant Acts, Laws or guidelines which relate to the proposed systems into their presentation boards.



